Project Overview
The Karachi Electric Supply Company (KESC, subsequently rebranded as K-Electric) underwent a major structural and operational turnaround following its privatization. To support capital restructuring and investment decisions, KESC and its lead sponsor, Abraaj Capital, commissioned a techno-commercial due diligence audit.
This audit was critical to evaluate the thermodynamic efficiency, historical asset degradation, and physical integrity of KE’s thermal power generation assets. Benchmarking fleet performance was necessary to justify subsequent plant modernization, fuel conversion programs, and lifecycle expansion investments.
Project Specifications
- Fleet Capacity: Covers a total power generation fleet capacity of 1,842 MW.
- Asset Technology: Multi-fuel thermal generation plants operating on natural gas, heavy fuel oil (HFO), and diesel, alongside associated high-voltage transmission lines and distribution substations.
- Financial and Sponsorship Context: Commissioned by KE and its financial sponsor, Abraaj Capital, to support strategic investment decisions and asset lifecycle risk management.
- Investment Benchmark: Supported the initial due diligence linked to a major capital investment structure to rehabilitate Karachi’s power generation and transmission network.
OMS Scope of Services
- Conducted the comprehensive technical and commercial due diligence on the 1,842 MW multi-fuel generation fleet and grid infrastructure.
- Executed physical site audits of generation stations and evaluated asset wear and structural integrity.
- Conducted plant thermal efficiency and thermodynamic degradation reviews to verify heat rates and residual asset lifespans.
- Performed utility asset risk assessments and analyzed technical viability to support strategic capital allocation.
Our Capabilities
Very few industries in modern society face the number of challenges seen in the agriculture sector. Many external forces wreak havoc on the farm business, and all are completely out of the business owner’s control.
Scope of Work
Our team delivered a full-cycle industrial solution, including:
Plant Design & Engineering
Comprehensive layout planning and structural design tailored for high-volume steel production.
Equipment Integration
Installation and configuration of advanced machinery, automated systems.
Process Optimization
Implementation of smart workflows to improve efficiency and reduce downtime.
Quality Control Systems
Deployment of monitoring technologies to maintain consistent product standards.
Key Features
Very few industries in modern society face the number of challenges seen in the agriculture sector. Many external forces wreak havoc on the farm business, and all are completely out of the business owner’s control. Weather, drought, pests, and disease constantly hammer agriculture. They augment the standard risks any business faces and put significant pressure on historically thin profit margins. Add to this the current stagnation in the available workforce, which was significantly amplified by the COVID-19 pandemic, and you have a menu of challenges that seem almost impossible.
Results & Impact
The project successfully delivered a high-performance steel manufacturing facility that significantly improved production efficiency and output quality. The integration of advanced technologies enabled seamless operations, reduced downtime, and enhanced overall productivity.
Project Information
Completely synergize resource taxing relationships via premier.
Client Name
KESC / Abraaj Capital
Category
Multi-Fuel
Implementation Period
Completed
Capacity
1842 MW
Location
Multiple, Sindh, Pakistan