Project Overview

Operating an interconnected high-voltage transmission grid requires coordinated protection and control schemes to prevent localized faults from cascading into widespread grid blackouts. The NGC (National Grid Company) Formerly known as National Transmission & Dispatch Company (NTDC) of Pakistan manages the country’s EHV and high-voltage transmission networks.

To protect the national grid during transient disturbances—such as sudden generator trips or major line overloads—NGC implements automated Cross-Trip and Under-Frequency Load Shedding (UFLS) schemes. These systems must rapidly disconnect pre-selected generators or loads to restore balance. Regular protection audits and dynamic stability simulations are technically critical to ensure these defense schemes operate selectively and with high speed.

Project Specifications

  • Target Infrastructure: National extra-high voltage (EHV) and high-voltage transmission networks managed by NGC.
  • System Integration: Encompasses coordinated protection interfaces across the NGC, DISCO, and GENCO networks.
  • Defense Mechanisms: Automated Cross-Trip Schemes and Under-Frequency Load Shedding (UFLS) parameters.
  • Engineering Objective: Prevent transient stability failures, frequency collapse, and cascading grid outages.

OMS Scope of Services

  • Evaluated and validated the Cross-Trip and Under-Frequency protection schemes across the NGC, DISCO, and GENCO networks.
  • Analyzed protective relay coordination parameters, response times, and trip logics.
  • Conducted power system stability simulations under dynamic contingency scenarios to verify grid resilience.
  • Formulated engineering recommendations to optimize system protection schemes.

Our Capabilities

Very few industries in modern society face the number of challenges seen in the agriculture sector. Many external forces wreak havoc on the farm business, and all are completely out of the business owner’s control.

Enhance production capacity with automated systems
Improve product consistency and precision
Reduce operational costs and material waste
Ensure safety and environmental compliance
Optimize workflow and plant efficiency

Scope of Work

Our team delivered a full-cycle industrial solution, including:

Plant Design & Engineering

Comprehensive layout planning and structural design tailored for high-volume steel production.

Equipment Integration

Installation and configuration of advanced machinery, automated systems.

Process Optimization

Implementation of smart workflows to improve efficiency and reduce downtime.

Quality Control Systems

Deployment of monitoring technologies to maintain consistent product standards.

Key Features

Very few industries in modern society face the number of challenges seen in the agriculture sector. Many external forces wreak havoc on the farm business, and all are completely out of the business owner’s control. Weather, drought, pests, and disease constantly hammer agriculture. They augment the standard risks any business faces and put significant pressure on historically thin profit margins. Add to this the current stagnation in the available workforce, which was significantly amplified by the COVID-19 pandemic, and you have a menu of challenges that seem almost impossible.

Fully automated production lines
High-precision steel processing technology
Real-time monitoring and control systems
Energy-efficient operations
Scalable infrastructure for future expansion

Results & Impact

The project successfully delivered a high-performance steel manufacturing facility that significantly improved production efficiency and output quality. The integration of advanced technologies enabled seamless operations, reduced downtime, and enhanced overall productivity.

Project Information

Completely synergize resource taxing relationships via premier.

Client Name

National Transmission & Despatch Company (NTDC)

Category

Grid & Transmission

Implementation Period

Completed

Capacity

N/A

Location

National, National, Pakistan

Have a
project in
mind?